If a homeowner has recently had new cement poured in their garage, they will have to wait at least 28 days to have a coating applied to the floor. The floor must be dry for the coating to adhere to it. If the homeowner has doubts about when the coating can be applied, they can use a moisture test kit.
Before epoxy flooring installation in Boston, MA, a professional may recommend that steps are taken to prepare an older cement floor. Grinding will get rid of layers that are chalky or dusting excessively. If an epoxy coating is applied to an older cement floor that is not properly prepared, the coating will not adhere to it.
Concrete in garages usually have expansion joints or saw cuts. These do not have to be filled before epoxy flooring installation in Boston, MA. However, some homeowners prefer this if they do not like to think about all the dirt and debris that can accumulate in the cracks. However, it is important to remember that joints and saw cracks are put in place to control cracking in the concrete.
If a homeowner notices that the concrete is cracked, they need to use crack filler. If they would like the joints to be filled in, they should use joint filler. It is important to use the proper material for the problem.
Saulnier Epoxy Floors specializes in Epoxy flooring installations. From residential to commercial epoxy flooring, to custom organization systems, they design and install top quality products backed by our lifetime warranty.